LSWR Winchfield to Basingstoke

railway
county:

Hampshire


commentary: From Winchfield Station, 40 miles from London Waterloo, rising at 1 in 480 through a deep cutting across Shapley Heath, across the River Whitewater to Hook Station at 42 1/4 mies, pylon lines etc, a level stretch, cross the Lyde River and the River Loddon, rise at 1 in 249, pass a junction with the GWR from Reading, to Basingstoke Station 48 miles from Waterloo.
Opened 10 July 1839.
included in London and Southampton Railway

mapping: goes through
main line
Winchfield
-- SU76315453
Winchfield
-- SU76145450
Winchfield
-- SU75545440
Hook
-- SU74075418
Hook
-- SU73085402
Hook Station, Hook
Hook
-- SU72485392
Black Bridge, Hook
Newnham
-- SU69625347
Old Basing
-- SU66155298
Basingstoke
-- SU64975282
Basingstoke
-- SU64685277, SU64255268
Basingstoke GWR Junction, Basingstoke
Basingstoke Station, Basingstoke
25.7.1834: authorized
10.6.1839: opened

   Old Hampshire Gazetteer - JandMN: 2001